Contractor induction
Read this before your first visit to any Cheops-managed building. Each building also has a site guide in the contractor portal with its own access, keys, plant, hazards and contacts.
Before you arrive
- Have the work order number for the job. No work order, no work.
- Read the building's site guide in the portal.
- Check the asbestos register before you drill, cut, sand or remove anything.
- Complete your task analysis in the portal, and request any permit you need (see below).
Signing in and out
- Scan the QR code at reception (or the plant room). Sign in with your work email and the one-time code we send you.
- Read and accept the building's hazards. You're then signed in.
- Scan the code again, or tap Sign out, when you leave. If you leave without signing out, we will assume you are still in the building in an evacuation.
- First time at the building? If your company is approved and you have a valid work order, you can register at the QR code with the work order number. You get access to that building for that job.
Keys and access cards
- Keys are issued at the building against a work order. Sign for them in the portal; you can see them under Your keys.
- Return them the same day, unless we've agreed otherwise. Don't lend them to anyone or copy them.
- Master and other restricted keys are issued only with approval. We can't close a work order while its keys are still out.
- Don't prop doors open or let people follow you into secure areas.
Task analysis and permits
- Complete a task analysis (JSA) in the portal before any higher-risk work. Start by picking the work order from the list; the building and job fill in for you. Add the people on the job and the steps, hazards and controls.
- Request permits in the portal. A permit needs a task analysis for the same work order.
- Hot work (welding, grinding, cutting, soldering with a flame) needs a hot work permit.
- Working at height, including all roof access, needs a working-at-heights permit. Roof keys are issued only against one.
- Confined spaces and isolations (electrical, mechanical, plumbing) must be arranged in advance, with lock-out and tag-out.
- Fire systems: never isolate a detector, sprinkler or alarm zone without arranging it with the help desk first. A false alarm can bring the fire service and a charge.
Asbestos
- If you find material you suspect contains asbestos and it isn't on the register, stop work, keep people away, and phone the help desk on 0800 123 594.
Working in occupied buildings
- Tenants are working around you. Keep noise, dust and smells to a minimum. Noisy work happens outside business hours unless agreed.
- Keep exits, corridors and lifts clear. Protect floors, walls and lift interiors when moving materials.
- Don't use tenants' kitchens, toilets or equipment without permission.
- A work order may include a tenant's contact details for access. Use them only for that job; we remove them when the order is closed.
- Take your waste with you. Building bins aren't for construction waste.
Heritage buildings
- Several of our buildings are heritage-listed. Don't fix to, cut or alter original fabric (stone, plaster, timber, decorative features) without written approval.
Incidents, hazards and emergencies
- In an emergency, call 111 first, then the help desk on 0800 123 594.
- Report every incident, near miss or new hazard in the portal, and phone the help desk. Serious injuries and other notifiable events must be reported straight away.
- In an evacuation, follow the wardens to the assembly point shown in the site guide, and don't re-enter until told.
Finishing up
- Make the area safe and tidy, restore any isolations with the help desk, return keys, and sign out.
- Send your completion report with photos and certificates by replying to the work order email.